Lorem Ipsum Dolor .......

Lorem ipsum lorem ipsum lorem ipsum lorem ipsum.......

Heat Shield Survey Continuing

Tue, 12 May 2009 13:19:51 -0500

The inspection of the shuttle's heat shield is continuing. Today's mission status briefing with Lead Flight Director Tony Ceccaci is scheduled to begin at 2:30 p.m. EDT on NASA TV. Afterward, NASA TV will air the ISS Progress 33 docking to the International Space Station, expected at 3:23 p.m. The post-MMT briefing with MMT Chair Leroy Cain is set for 5 p.m.

0 comments:

Post a Comment